Tinted to one of Quantum’s Solid Opaque Stains
Low Sheen
<19g per litre
Old Timber may use up 1 litre per 2 m2, New Timber may use up to 1 litre per 7 m2 per litre. First coat may use more depending upon the porosity of the timber.
Touch Dry – 6-8 hour, Recoat – 12 hours (In cooler or humid conditions drying times will be longer. Do not apply if temperature is below 12°C or above 30°C. The first coat on new timber may be fairly slow to dry as it mixes with the sap in a particular timber).
Water
1L, 4L, 10L & 20L
4500